Regulatory Oversight Group (ROG) Information
December 12, 2022 Meeting Materials and Meeting Access Information (PDF)
Update March 23, 2022
The Town of Wellfleet and Cape Cod National Seashore jointly filed a Notice of Intent with the Truro Conservation Commission for authorization of Phase 1 of the Herring River Restoration Project as an Ecological Restoration Limited Project. View the project application files:
Appendices, Including Project Design Plans
- Appendix A: Project Design Plans
- Appendix B: Agency Correspondence
- Appendix C: Habitat Restoration and Monitoring Plan
- Appendix D: List of Permits Required for Project
- Appendix E: Wetlands Delineations
- Appendix F: Combined Permit/401 Water Quality Cert.
- Appendix G: Stream Crossing Photos
- Appendix H: Operator and Maintenance Plans
- Appendix I: Stormwater Reports
- Appendix J: Hydrodynamic Studies
- Appendix K: Groundwater Studies
- Appendix L: Herring River Adaptive Management Plan
- Appendix M: Design Alternatives for Class 1 Project Elements
- Appendix N: Inland Wetland Restriction Order